Victoria Way - Charlton, SE7
This 4 week external refurbishment
of a bonded warehouse was undertaken for Kerry Logistics Limited.
The work consisted of the external repairs
to the building fabric including brickwork, concrete and render,
as well as the redecoration of all doors, windows and perimeter
railings. The existing flat roof was repaired and overlaid with
all the existing rainwater systems being cleaned, and overhauled.
Extensive areas of the existing service yard, access road and
car park were repaired and resurfaced.
<< Back to industrial
projects
|